Material Loading and Unloading Platform
A platform for receiving and dispatching tower-crane loads at floor level.
Use, models and specifications
About Product
The installation platform is a steel platform used to take the material brought to top floors with tower crane. It is used in transferring cement, brick, plasterboard, ceramic and crawled structure materials into layers.
Telescopic struts are adapted to floor height. The floor at the same level is designed for transpallet input without ramp; foldable and detachable railings make the transportation and storage layout easier.
Standard models are offered with 2,000 or 2.500 kg carrying capacity. There are production options in special size and load capacity.
Technical Specifications
Scroll horizontally to see all columns.
| Model | Load capacity(kg) | Width (mm) | Length (mm) | Height (mm) | Unladen weight (kg) |
|---|---|---|---|---|---|
| YP-2000 | 2,000 | 2,100 | 4,100 | 1,200 | 516 |
| YP-2500 | 2,500 | 2,600 | 5,100 | 1,200 | 872 |
| YP-3000 | 2,500 | 3,100 | 6,100 | 1,200 | 990 |
Construction and equipment
- Material
- Steel
- Strut system
- Telescopic
- Floor
- Same plane with floor level
- Handrails
- Foldable and detachable
- Height measurement
- Total height including guardrail
Manufacturing and options
- Standard Surface
- Industrial paint
- Surface option
- Galvanized coating
Operation and use
- Material input
- Convenient design for transpalet input
Material Transfer in Floor Level
The platform is taken and fixed to the level of floor with the help of the crane. The floor in the same plane allows the transpaletle material to be taken inside; the layout for forklift entry is also handled with the need for use.
Construction and options
Strut and Railing System
Telescopic struts can be adapted to floor height. The foldable and detachable railing system is structural detail used in the conveying and storage layout of the platform.
Models and Surface Options
The height in model dimensions shows total height, including railings.
The body is made of steel. The standard surface is industrial paint; galvanized coating, special size and load capacity options can be requested.
Required Information For Offer
It is used to take the top floors of the crawler structure materials and to carry it in floor. Share the floor height, field and layout dimensions, material weight/sizes, crane layout and need for transpallet or forklift inlet.
Technical Documents and Manufacturing Assurance
- CE Conformity Documentation
- Available
- Load Test Report
- Included with the product
- Structural Calculation Report
- Included with the product
Get Offer For Material Removal / Extraction Platform
Share Kat/cephe size, load, model need, connection and field layout.
- Phone
- +90 553 191 38 97



