Search products and categories

Access & Security

Material Loading and Unloading Platform

A platform for receiving and dispatching tower-crane loads at floor level.

Product guide

Use, models and specifications

About Product

The installation platform is a steel platform used to take the material brought to top floors with tower crane. It is used in transferring cement, brick, plasterboard, ceramic and crawled structure materials into layers.

Telescopic struts are adapted to floor height. The floor at the same level is designed for transpallet input without ramp; foldable and detachable railings make the transportation and storage layout easier.

Standard models are offered with 2,000 or 2.500 kg carrying capacity. There are production options in special size and load capacity.

Technical Specifications

Model dimensions and specifications
ModelLoad capacity(kg)Width (mm)Length (mm)Height (mm)Unladen weight (kg)
YP-20002,0002,1004,1001,200516
YP-25002,5002,6005,1001,200872
YP-30002,5003,1006,1001,200990

Construction and equipment

Material
Steel
Strut system
Telescopic
Floor
Same plane with floor level
Handrails
Foldable and detachable
Height measurement
Total height including guardrail

Manufacturing and options

Standard Surface
Industrial paint
Surface option
Galvanized coating

Operation and use

Material input
Convenient design for transpalet input

Material Transfer in Floor Level

The platform is taken and fixed to the level of floor with the help of the crane. The floor in the same plane allows the transpaletle material to be taken inside; the layout for forklift entry is also handled with the need for use.

Construction and options

Strut and Railing System

Telescopic struts can be adapted to floor height. The foldable and detachable railing system is structural detail used in the conveying and storage layout of the platform.

Models and Surface Options

The height in model dimensions shows total height, including railings.

The body is made of steel. The standard surface is industrial paint; galvanized coating, special size and load capacity options can be requested.

Required Information For Offer

It is used to take the top floors of the crawler structure materials and to carry it in floor. Share the floor height, field and layout dimensions, material weight/sizes, crane layout and need for transpallet or forklift inlet.

Technical Documents and Manufacturing Assurance

CE Conformity Documentation
Available
Load Test Report
Included with the product
Structural Calculation Report
Included with the product
Product offer

Get Offer For Material Removal / Extraction Platform

Share Kat/cephe size, load, model need, connection and field layout.

Contact and Quote Privacy Notice

WhatsApp